HSBC Headquarters

This project was a full internal refurbishment of the main HSBC facility in Sri Lanka which is situated in Fort. The building consisted of 7 stories including a basement floor, two mezzanine floors. The first, second, third and fourth floors are used as office complexes that services staff and high priority data. The system includes Main Equipment Room conditioned using sophisticated precision air conditioning system and protected using inergen fire suppression system. All MEP systems was designed to meet global standards as well as HSBC guidelines which have been stipulated by HSBC Hong Kong. EnergySolve Engineering was the appointed independent MEP consultant and the following MEP systems were designed and supervised by enhancing the contractor’s workmanship; with the goal of improving system performance to meet the prerequisites of LEED Gold certification.

Back-up generators

Electrical grid power supply and distribution

Interior and exterior lighting and control systems

Lightning protection system

MATV system

Fire detection system

Data system (data, telephone & Wi-Fi)

CCTV system

Building management system

Central air conditioning system and mechanical ventilation

Fire fighting system

Hot water production and distribution system

Cold water storage and distribution system

Sewer and waste water drainage and disposal

Sewer and waste water drainage and disposal

Storm water drainage system

Lift and elevators